FOR SOLAR & BATTERY CONTRACTORS
Your installation. Our supply expertise.
Level 2 supply, connection and metering support around your solar or battery project. Get the supply scope clear before committing to your own price or installation date.

A clear role in your installation team.
Masters is your specialist Level 2 partner for the supply, connection and metering work associated with your installation. Agree our scope alongside your team’s system design and installation responsibilities.
Establish what the site actually needs.
A solar or battery installation does not automatically require every supply upgrade. Start with the proposed system, existing supply and connection requirements.
Send a brief that connects the two scopes.
Include the address, any existing photos of the supply and meter board, proposed system details, connection requirements already received and your preferred installation date. We’ll identify the information needed to assess our part of the job. Only take new photos from safe, accessible positions. Keep covers closed and stay clear of damaged electrical equipment.
Discuss the sequence before locking in assumptions.
Metering, supply work and installation requirements can involve different parties. Agree the scope, dependencies and timing for the Level 2 works before relying on a completion date.
Send us your next Level 2 jobA FEW USEFUL ANSWERS
Before we get started.
Does every solar or battery job need a three-phase upgrade?
No. The requirements depend on the proposed installation, the existing supply and the applicable connection requirements. Send the details so the Level 2 scope can be assessed.
Can Masters coordinate work with our installation date?
Send the proposed date with your enquiry. We can discuss availability, the required scope and any approvals or third-party dependencies before arrangements are confirmed.
Bring us into your next job.
Send the site details and a brief scope. Let’s work through the Level 2 requirements.