TEMPORARY & PERMANENT SUPPLIES

From temporary power to the final connection.

Plan the Level 2 supply works alongside your construction stages, from establishing the site to connecting the completed installation.

Two technicians in high-visibility Masters workwear beside a pole installation area and work vehicle.

Bring the stages into the first conversation.

Use existing photos or safe, accessible views with covers closed. Do not approach damaged electrical equipment.

Send job details ↗

01

Send the address, site plans and proposed temporary and permanent supply locations.

02

Outline known power requirements and the construction stages that depend on the supply.

03

Name the coordinating builder or electrician and separate your quotation deadline from the work dates.

Start with the stages, then define the works.

Temporary and permanent arrangements should be considered alongside the wider electrical and construction scope.

Temporary construction power

Assessment of the connection and associated Level 2 works for the proposed temporary supply.

Permanent supply

New or altered supply works for the completed installation.

Repair and restoration projects

Temporary or permanent supply requirements associated with damage repairs, where suitable for the site.

Fit the supply into the site plan.

Supply location, access, civil works, switchboards, consumer mains and other trade responsibilities can affect the final arrangement. Share the planned stages so these can be addressed early.

ILLUSTRATIVE ARRANGEMENT

Who handles what?

An illustrative construction supply arrangement, from temporary power to the permanent installation.

Temporary supply arrangement

Masters

The temporary supply and connection works listed in the quote.

Your business

Confirm construction needs, site location and the stage required.

Other parties

Network or metering parties where applicable.

Site distribution and use

Masters

Only the construction distribution work included in our scope.

Your business

Arrange their site distribution, site management and relevant responsibilities.

Other parties

Other site electrical contractors where engaged.

Permanent supply transition

Masters

The agreed permanent connection work and planned changeover.

Your business

Confirm the building installation is ready to the agreed stage.

Other parties

Builder, retailer, network or metering parties as needed.

Access, trenching and reinstatement

Masters

Only the civil and access-related work expressly included.

Your business

Coordinate site access and identify who completes civil work and making good.

Other parties

Civil or building trades allocated to those tasks.

Temporary power, the permanent connection and removal of temporary equipment are separate scope items unless the quote includes them together.

A FEW USEFUL ANSWERS

Before we get started.

Can temporary power be arranged for an insurance repair?

We can assess the site and proposed requirements. Suitability, scope, timing and any prerequisites need to be confirmed before a temporary arrangement is agreed.

Can the temporary and permanent stages be quoted together?

Yes. Provide the details available for both stages. Any assumptions, exclusions or later decisions should be clearly identified in the agreed scope.

Bring us into your next job.

Send the site details and a brief scope. Let’s work through the Level 2 requirements.